<v Host>Today we dive into the new DoD AI ban that forces contractors to rethink every model they use.

00:00:21.143 --> 00:00:33.240
<v Analyst>The law, Section 1532 of the FY2026 NDAA, prohibits any contractor from using AI developed by DeepSeek or High Flyer during DoD contract performance.

00:00:33.587 --> 00:00:38.513
<v Host>So if a company runs a DeepSeek model on its own servers, does the ban still apply?

00:00:38.887 --> 00:00:46.631
<v Analyst>Yes. The statute never mentions deployment mode. Whether the model is in the cloud or on-premises, it still counts as ‘use’.

00:00:46.905 --> 00:00:50.165
<v Host>That's surprising because many think self-hosting might be a loophole.

00:00:50.478 --> 00:00:56.432
<v Analyst>The law attaches to the developer, not the hosting arrangement. It follows the model wherever it runs.

00:00:56.762 --> 00:01:01.260
<v Host>So a DeepSeek API call or a GPU cluster in a private data center is covered.

00:01:01.543 --> 00:01:10.431
<v Analyst>Correct. The text says nothing about local-model exemption. The definition of ‘covered artificial intelligence’ runs on developer lineage.

00:01:10.705 --> 00:01:14.123
<v Host>What about fine-tuning a DeepSeek model? Does that change anything?

00:01:14.519 --> 00:01:22.225
<v Analyst>Fine-tuning still ties back to the base model. The statute includes successor AI developed by DeepSeek or High Flyer.

00:01:22.532 --> 00:01:25.382
<v Host>So any modification doesn't help avoid the prohibition.

00:01:25.677 --> 00:01:32.706
<v Analyst>Exactly. The prohibition applies to any use in contract performance, regardless of how the model is accessed.

00:01:33.004 --> 00:01:37.725
<v Host>What about other Chinese-origin models like Qwen or GLM? Are they covered?

00:01:38.101 --> 00:01:44.738
<v Analyst>The statute names only DeepSeek and High Flyer. Qwen, GLM, Kimi, MiniMax are not listed.

00:01:44.999 --> 00:01:50.062
<v Host>But I've heard Alibaba and Baidu were added to a DoD list. Does that change things?

00:01:50.510 --> 00:01:57.542
<v Analyst>They joined the Section 1260H list, which could trigger a broader prohibition if the Secretary issues guidance.

00:01:57.688 --> 00:01:59.328
<v Host>Has any guidance been issued yet?

00:01:59.730 --> 00:02:06.211
<v Analyst>No public confirmation exists. The wider category remains a watch item, not a live prohibition.

00:02:06.479 --> 00:02:09.963
<v Host>So for now, only DeepSeek and High Flyer are strictly prohibited.

00:02:10.281 --> 00:02:16.003
<v Analyst>Yes, but be aware that pending legislation could add more names, and the current list is contested.

00:02:16.345 --> 00:02:23.097
<v Host>Let's talk about compliance frameworks. Does CMMC or NIST 800-171 mention these AI restrictions?

00:02:23.463 --> 00:02:32.705
<v Analyst>Neither does. CMMC maps to 110 controls of NIST 800-171, but there is no AI-origin rule.

00:02:33.051 --> 00:02:36.365
<v Host>So the statutory ban is separate from CMMC compliance.

00:02:36.707 --> 00:02:44.628
<v Analyst>Correct. The ban applies to the use of covered AI, while CMMC requires adequate security controls for every system.

00:02:44.950 --> 00:02:50.297
<v Host>What about DFARS 252-7012? Does it involve AI models?

00:02:50.685 --> 00:03:03.531
<v Analyst>DFARS 252-7012 mandates that covered contractor systems meet the same 110 controls, and cloud providers must meet FedRAMP Moderate or equivalent.

00:03:03.716 --> 00:03:06.570
<v Host>So removing DeepSeek doesn't satisfy DFARS?

00:03:06.985 --> 00:03:15.838
<v Analyst>No. DFARS concerns control implementation, not model lineage. You still need to address the statutory prohibition separately.

00:03:16.099 --> 00:03:20.293
<v Host>Understood. Let's discuss the practical steps a contractor should take.

00:03:20.598 --> 00:03:29.000
<v Analyst>First, inventory every AI model in use, both commercial and self-hosted, and trace each against the covered AI definition.

00:03:29.304 --> 00:03:31.393
<v Host>How do you trace a model to the definition?

00:03:31.745 --> 00:03:41.261
<v Analyst>Check the developer lineage. If the model originates from DeepSeek or High Flyer, or an entity with at least 20 percent stake in High Flyer, it is covered.

00:03:41.519 --> 00:03:45.130
<v Host>What about models that are not named? Do they automatically comply?

00:03:45.537 --> 00:03:54.666
<v Analyst>Not automatically. They still need to be secured under the 110 controls. You must verify they don’t send CUI to external systems.

00:03:54.970 --> 00:03:58.282
<v Host>So the next step is mapping the environment to the 110 controls?

00:03:58.687 --> 00:04:10.415
<v Analyst>Exactly. Use the seven-stage method: define the data boundary, prototype with your data, size hardware, isolate the cluster, deploy the model, layer access controls, and validate.

00:04:10.699 --> 00:04:12.838
<v Host>Could you give an example of hardware sizing?

00:04:13.257 --> 00:04:23.310
<v Analyst>A 7B parameter model runs on a single NVIDIA A100 or H100 GPU. Larger models may need two to four GPUs.

00:04:23.624 --> 00:04:27.939
<v Host>What about open-weight models like Gemma 4? Are they suitable for DoD work?

00:04:28.310 --> 00:04:35.916
<v Analyst>Gemma 4 is released under Apache 2.0, and it is not named in any U.S. restriction. It can be a compliant replacement.

00:04:36.072 --> 00:04:37.875
<v Host>Does the license matter for procurement?

00:04:38.263 --> 00:04:45.124
<v Analyst>Yes. Apache 2.0 is commercially permissive, so your procurement team can handle it without additional legal hurdles.

00:04:45.299 --> 00:04:47.019
<v Host>What about compliance documentation?

00:04:47.373 --> 00:05:00.098
<v Analyst>Petronella Technology Group provides a compliance platform called Compliance Armor®. It automates SSP authoring, POA&M tracking, and evidence repository organization.

00:05:00.389 --> 00:05:03.881
<v Host>So you can integrate the inventory and removal record into that system?

00:05:04.258 --> 00:05:11.676
<v Analyst>Exactly. That documentation feeds into your system security plan and ensures you have evidence before any audit.

00:05:12.016 --> 00:05:15.964
<v Host>What about the waiver mechanism? Can we get a waiver for using DeepSeek?

00:05:16.349 --> 00:05:28.144
<v Analyst>Section 1532(b) offers waivers only for scientific research, national security, counterterrorism, or mission-critical functions, with risk mitigation steps.

00:05:28.309 --> 00:05:30.895
<v Host>So ordinary contract analytics wouldn't qualify?

00:05:31.253 --> 00:05:38.207
<v Analyst>Correct. The categories are narrow, and the waiver is an affirmative government decision, not an internal exception.

00:05:38.507 --> 00:05:41.372
<v Host>If we can't get a waiver, what is the next best action?

00:05:41.747 --> 00:05:50.714
<v Analyst>Remove the model from any DoD contract workflow and replace it with an unnamed, compliant model like Gemma 4 or Llama 3.1.

00:05:50.923 --> 00:05:54.591
<v Host>Does that satisfy DFARS 252-7012?

00:05:55.003 --> 00:06:03.490
<v Analyst>Yes, provided you implement the 110 controls for the new model environment. DFARS is about security, not lineage.

00:06:03.831 --> 00:06:08.232
<v Host>What about the intelligence community? Does Section 6604 affect us?

00:06:08.592 --> 00:06:18.039
<v Analyst>Section 6604 prohibits DeepSeek on intelligence community systems, and it directs the Director of National Intelligence to develop standards.

00:06:18.386 --> 00:06:23.652
<v Host>So if we support an IC element, the ban applies even if the broader Section 1532 doesn't?

00:06:24.006 --> 00:06:30.403
<v Analyst>Correct. Section 6604 is application-focused and reaches IC contractors directly.

00:06:30.711 --> 00:06:33.567
<v Host>So we need to check whether we work with any IC element.

00:06:33.839 --> 00:06:39.948
<v Analyst>Yes. If you do, you must remove DeepSeek from those workflows and replace it with a compliant model.

00:06:40.229 --> 00:06:42.960
<v Host>Let's talk about the timeline. When do we need to act?

00:06:43.360 --> 00:06:54.536
<v Analyst>Section 1532(a)(1) required the Department to remove covered AI from its systems within 30 days of enactment. The same pace applies downstream.

00:06:54.879 --> 00:06:57.367
<v Host>So we have a 30-day window to audit our systems?

00:06:57.763 --> 00:07:04.048
<v Analyst>Yes, but the audit expectation is already explicit in practitioner guidance. You should start immediately.

00:07:04.346 --> 00:07:08.470
<v Host>What about the pending FY2027 bill? Should we wait for it?

00:07:08.861 --> 00:07:19.110
<v Analyst>The bill could add names like Baidu, Zhipu AI, Moonshot AI, 01.AI, MiniMax, Alibaba, and Tencent. Until it becomes law, treat it as a watch item.

00:07:19.367 --> 00:07:22.196
<v Host>So we should monitor guidance and stay ready to adjust?

00:07:22.554 --> 00:07:29.873
<v Analyst>Exactly. Set a review cadence for any new guidance or legislation, and keep your compliance documentation up to date.

00:07:30.198 --> 00:07:33.797
<v Host>What if we accidentally use a covered model in a non-DoD contract?

00:07:34.215 --> 00:07:41.059
<v Analyst>The prohibition is limited to DoD contract performance. Non-DoD contracts are outside the statutory scope.

00:07:41.400 --> 00:07:45.682
<v Host>But could that still trigger a flow-down clause or other contractual obligation?

00:07:46.064 --> 00:07:53.216
<v Analyst>It depends on the specific DFARS clause. The statute didn't create a new clause, so you need to consult counsel.

00:07:53.474 --> 00:07:57.187
<v Host>So it's safest to audit all AI use regardless of contract type.

00:07:57.466 --> 00:08:03.361
<v Analyst>Yes, that proactive approach reduces risk and ensures compliance across all operations.

00:08:03.698 --> 00:08:06.175
<v Host>How do we document the removal of a covered model?

00:08:06.570 --> 00:08:13.948
<v Analyst>Record the model version, the date of removal, the reason, and the replacement model details in your system security plan.

00:08:14.236 --> 00:08:17.484
<v Host>And we should keep evidence of the waiver if we ever apply for one?

00:08:17.914 --> 00:08:24.092
<v Analyst>Yes, maintain signed attestations, risk mitigation plans, and any official waiver documents.

00:08:24.423 --> 00:08:26.807
<v Host>What are the key takeaways for a contractor right now?

00:08:27.173 --> 00:08:38.592
<v Analyst>Audit all AI, remove covered models from DoD workflows, replace with compliant open-weight models, map to the 110 controls, and stay alert to new guidance.

00:08:38.869 --> 00:08:43.621
<v Host>What are the deeper implications if a contractor ignores Section 1532?

00:08:44.022 --> 00:08:49.516
<v Analyst>Ignoring it could trigger enforcement actions, penalties, and loss of DoD contracts.

00:08:49.781 --> 00:08:52.810
<v Host>Could those penalties be monetary or purely contractual?

00:08:53.211 --> 00:08:56.934
<v Analyst>Both; the law can impose fines and force contract termination.

00:08:57.257 --> 00:08:59.372
<v Host>Is there a risk of a broader security audit?

00:08:59.742 --> 00:09:03.879
<v Analyst>Yes, auditors may scrutinize all AI systems tied to DoD work.

00:09:04.208 --> 00:09:06.502
<v Host>How does this affect non-DoD data handling?

00:09:06.867 --> 00:09:11.086
<v Analyst>Non-DoD data can still be processed, but the model must be compliant.

00:09:11.377 --> 00:09:13.713
<v Host>What about the hardware cost for a compliant model?

00:09:14.071 --> 00:09:21.535
<v Analyst>A 7B parameter model fits on a single NVIDIA A100, but larger ones need multiple GPUs.

00:09:21.805 --> 00:09:24.375
<v Host>Do we need to size the cluster before choosing a model?

00:09:24.733 --> 00:09:28.729
<v Analyst>Yes, a scoping prototype on your data informs hardware sizing.

00:09:29.022 --> 00:09:32.249
<v Host>What if we have a mix of models, some covered, some not?

00:09:32.690 --> 00:09:36.586
<v Analyst>Separate them by workflow; remove covered ones from DoD paths.

00:09:36.891 --> 00:09:39.369
<v Host>Can we still use a covered model for training only?

00:09:39.795 --> 00:09:45.464
<v Analyst>Section 1532(b) allows case-by-case waivers for research or training.

00:09:45.752 --> 00:09:47.361
<v Host>How do we apply for such a waiver?

00:09:47.731 --> 00:09:52.890
<v Analyst>Submit a formal request with risk mitigation steps; approval is government-issued.

00:09:53.037 --> 00:09:54.731
<v Host>If we get denied, what then?

00:09:55.121 --> 00:09:58.346
<v Analyst>You must replace the model before continuing DoD work.

00:09:58.611 --> 00:10:00.708
<v Host>What are the common mistakes we should avoid?

00:10:01.117 --> 00:10:05.655
<v Analyst>Assuming local hosting is exempt; assuming fine-tuning removes coverage.

00:10:05.921 --> 00:10:07.992
<v Host>Is fine-tuning a new model under the law?

00:10:08.441 --> 00:10:12.540
<v Analyst>No, the base model remains covered regardless of modifications.

00:10:12.886 --> 00:10:15.386
<v Host>How do we document that we have removed a covered model?

00:10:15.825 --> 00:10:21.847
<v Analyst>Log the version, removal date, reason, and replacement details in the system security plan.

00:10:22.169 --> 00:10:25.114
<v Host>Do we need to update the system security plan for every change?

00:10:25.490 --> 00:10:29.277
<v Analyst>Yes, keep the plan current to reflect the latest AI environment.

00:10:29.540 --> 00:10:31.515
<v Host>What about the 30-day window for removal?

00:10:31.894 --> 00:10:36.350
<v Analyst>The statute gave the Department 30 days; contractors should act promptly.

00:10:36.693 --> 00:10:39.058
<v Host>Should we monitor for new guidance from the Secretary?

00:10:39.492 --> 00:10:46.467
<v Analyst>Absolutely; a review cadence every 60 days keeps you aligned with Section 1532(a)(2).

00:10:46.766 --> 00:10:49.873
<v Host>How does CMMC Level 2 interact with this requirement?

00:10:50.226 --> 00:10:57.931
<v Analyst>CMMC Level 2 maps to NIST 800-171 controls but does not lift the statutory ban.

00:10:58.205 --> 00:11:01.907
<v Host>So we still need to remove covered models even with a CMMC certificate?

00:11:02.348 --> 00:11:06.220
<v Analyst>Correct; compliance frameworks and statutes operate independently.

00:11:06.552 --> 00:11:09.900
<v Host>What if we use a model from an unnamed Chinese-origin company?

00:11:10.274 --> 00:11:16.163
<v Analyst>Check the 1260H list and pending Section 1651; these may be added later.

00:11:16.484 --> 00:11:19.700
<v Host>Does the 1260H list immediately impose a ban?

00:11:20.143 --> 00:11:27.403
<v Analyst>Only if the Secretary issues guidance under Section 1532(a)(2); currently, it's a watch item.

00:11:27.704 --> 00:11:30.355
<v Host>Could a vendor's 20 percent stake trigger coverage?

00:11:30.714 --> 00:11:35.117
<v Analyst>Yes, any entity with at least 20 percent stake in High Flyer is covered.

00:11:35.419 --> 00:11:39.185
<v Host>What about the 24/7 AI-plus-human hybrid threat analysis?

00:11:39.541 --> 00:11:44.748
<v Analyst>That approach keeps AI in a controlled environment but still requires model compliance.

00:11:45.095 --> 00:11:48.118
<v Host>How do we ensure the AI stays within a controlled enclave?

00:11:48.559 --> 00:11:53.491
<v Analyst>Use a segmented VLAN or air-gap, apply encryption at rest and in transit.

00:11:53.799 --> 00:11:56.753
<v Host>Do we need FIPS-validated cryptography for CUI?

00:11:57.107 --> 00:12:03.594
<v Analyst>Yes, per NIST 800-171, FIPS validation is required for all controls.

00:12:03.938 --> 00:12:06.234
<v Host>What is the cost trade-off for private deployment?

00:12:06.643 --> 00:12:12.385
<v Analyst>At 500,000 tokens per day, private deployment breaks even within 6 to 12 months.

00:12:12.687 --> 00:12:14.873
<v Host>What if our usage is below that threshold?

00:12:15.255 --> 00:12:19.538
<v Analyst>Run a cost analysis before purchasing hardware; API may be cheaper.

00:12:19.829 --> 00:12:22.862
<v Host>How does the hardware sizing work for a 31B model?

00:12:23.261 --> 00:12:30.657
<v Analyst>It may need multiple GPUs; reference clusters use 128 GB unified memory per node.

00:12:30.955 --> 00:12:33.335
<v Host>Do we need to sign any new DFARS clauses?

00:12:33.752 --> 00:12:38.306
<v Analyst>No new clauses exist yet; consult your legal team to confirm flow-down.

00:12:38.474 --> 00:12:40.510
<v Host>What about the 60-day guidance deadline?

00:12:40.867 --> 00:12:45.575
<v Analyst>The Secretary must issue guidance within 60 days; monitor for that release.

00:12:45.844 --> 00:12:48.739
<v Host>How do we prepare for a potential 2027 bill?

00:12:49.090 --> 00:12:53.791
<v Analyst>Review the pending Section 1651; it could add new names to the list.

00:12:54.119 --> 00:12:57.493
<v Host>What if a model is not named but originates from a covered nation?

00:12:57.896 --> 00:13:02.547
<v Analyst>The statute does not generalize by nation; only named developers are covered.

00:13:02.856 --> 00:13:06.906
<v Host>What if we inadvertently use a covered model in a non-DoD contract?

00:13:07.347 --> 00:13:12.339
<v Analyst>It remains outside the statutory scope, but contractual flow-down may still apply.

00:13:12.494 --> 00:13:13.940
<v Host>Should we still audit that usage?

00:13:14.377 --> 00:13:18.363
<v Analyst>Yes, a proactive audit reduces risk across all operations.

00:13:18.627 --> 00:13:21.532
<v Host>What are the first concrete steps a contractor should take?

00:13:21.944 --> 00:13:25.477
<v Analyst>Start with an inventory of all AI models and their lineage.

00:13:25.767 --> 00:13:28.797
<v Host>Then map each to the 110 NIST controls?

00:13:29.154 --> 00:13:33.156
<v Analyst>Exactly; document how each model meets or fails the controls.

00:13:33.348 --> 00:13:35.202
<v Host>What about the system security plan?

00:13:35.623 --> 00:13:39.384
<v Analyst>Update it with the new AI environment, including hardware specs.

00:13:39.732 --> 00:13:43.231
<v Host>Do we need to document risk mitigation for any remaining covered models?

00:13:43.680 --> 00:13:48.408
<v Analyst>If a waiver is requested, capture all mitigation steps and risk assessments.

00:13:48.678 --> 00:13:51.099
<v Host>How do we avoid common documentation mistakes?

00:13:51.508 --> 00:13:55.563
<v Analyst>Ensure every entry references the exact model version and vendor.

00:13:55.862 --> 00:13:58.621
<v Host>What if the vendor changes the model after we deploy it?

00:13:59.033 --> 00:14:02.562
<v Analyst>Treat any new release as a new version; re-audit for coverage.

00:14:02.880 --> 00:14:05.805
<v Host>What questions do clients often ask about this law?

00:14:06.194 --> 00:14:10.437
<v Analyst>Do I need to remove the model from all systems, or just DoD workflows?

00:14:10.800 --> 00:14:13.274
<v Host>Do I need to get a waiver if I only use it for training?

00:14:13.676 --> 00:14:16.812
<v Analyst>Do I have to monitor for updates to the 1260H list?

00:14:17.168 --> 00:14:20.258
<v Host>Do I need to change my cloud provider to meet the FedRAMP baseline?

00:14:20.663 --> 00:14:24.150
<v Analyst>Do I need to re-validate encryption after a hardware upgrade?

00:14:24.511 --> 00:14:26.441
<v Host>What if we have a hybrid cloud environment?

00:14:26.793 --> 00:14:30.968
<v Analyst>Separate the DoD data path; keep the model in a compliant enclave.

00:14:31.236 --> 00:14:34.115
<v Host>How do we stay ahead of the pending Section 1651?

00:14:34.489 --> 00:14:38.672
<v Analyst>Track the legislative docket and engage with counsel for early guidance.

00:14:38.997 --> 00:14:41.360
<v Host>What is the impact on our procurement process?

00:14:41.736 --> 00:14:45.412
<v Analyst>Add a clause that requires the contractor to audit AI lineage.

00:14:45.742 --> 00:14:47.616
<v Host>Should we involve our compliance team early?

00:14:48.044 --> 00:14:51.977
<v Analyst>Yes, they can align the system security plan with the new requirements.

00:14:52.262 --> 00:14:55.021
<v Host>What is the role of the C3PAO in this context?

00:14:55.403 --> 00:15:00.136
<v Analyst>They assess the 110 controls but do not evaluate AI lineage.

00:15:00.466 --> 00:15:03.908
<v Host>Will the C3PAO need to re-audit after we replace a model?

00:15:04.302 --> 00:15:08.365
<v Analyst>They will verify the new model meets the controls and documentation.

00:15:08.619 --> 00:15:10.996
<v Host>What if we use an open-weight model that is not named?

00:15:11.443 --> 00:15:17.124
<v Analyst>It remains compliant with Section 1532, but you must still map it to NIST controls.

00:15:17.469 --> 00:15:20.079
<v Host>Are there any cost-saving tips for private deployment?

00:15:20.519 --> 00:15:25.606
<v Analyst>Use quantized models; they run on consumer GPUs and lower memory needs.

00:15:25.870 --> 00:15:28.605
<v Host>What if we need to process 5 million tokens daily?

00:15:29.014 --> 00:15:33.713
<v Analyst>Private deployment will be 60 to 80 percent cheaper than API spend.

00:15:34.008 --> 00:15:39.132
<v Host>What about the 773 to 1,391 Level 2 certifications trend?

00:15:39.493 --> 00:15:44.096
<v Analyst>It shows growing awareness; staying compliant positions you for more contracts.

00:15:44.375 --> 00:15:47.246
<v Host>Do we need to update our POA&M for AI changes?

00:15:47.686 --> 00:15:51.943
<v Analyst>Yes, add new action items and status updates for AI compliance.

00:15:52.228 --> 00:15:54.558
<v Host>What if we accidentally re-introduce a covered model?

00:15:54.943 --> 00:15:59.358
<v Analyst>Implement strict access controls and audit logs to detect such events.

00:15:59.688 --> 00:16:02.834
<v Host>How do we handle external consultants using our models?

00:16:03.232 --> 00:16:07.336
<v Analyst>Require them to sign attestations and confirm model compliance.

00:16:07.454 --> 00:16:09.645
<v Host>What about the 24/7 hybrid approach?

00:16:10.071 --> 00:16:14.735
<v Analyst>It keeps AI in a controlled environment but still requires model compliance.

00:16:15.022 --> 00:16:17.398
<v Host>Is there a benefit to using a model like Gemma 4?

00:16:17.805 --> 00:16:22.461
<v Analyst>It is open-weight, not covered by the statute, and under an Apache 2.0 license.

00:16:22.792 --> 00:16:24.984
<v Host>Do we need to purchase a license for Gemma 4?

00:16:25.395 --> 00:16:29.976
<v Analyst>The Apache 2.0 license is permissive; no purchase needed beyond hardware.

00:16:30.292 --> 00:16:32.169
<v Host>What if we need to fine-tune Gemma 4?

00:16:32.573 --> 00:16:36.498
<v Analyst>Fine-tuning is allowed; just document the process and data used.

00:16:36.753 --> 00:16:38.962
<v Host>Do we need to report fine-tuning to the Department?

00:16:39.346 --> 00:16:43.196
<v Analyst>No, unless the fine-tuning is part of DoD contract performance.

00:16:43.452 --> 00:16:46.643
<v Host>What if our model is from a 1260H-designated company?

00:16:47.000 --> 00:16:51.286
<v Analyst>Consult counsel before using it; it may be added to the statutory list.